|
Drinking Water for New Zealand
Managed by ESR for the Ministry of Health. Data extracted from the National WINZ Database. |
|
| WINZ Item: 1004 | Status: Archive | Written: 6 September 2002 |
Risk management plans will be able to be developed in WINZ 5.0 when it becomes available, probably in April 2003. This will allow you to automatically create a draft set of plans based on your supply's characteristics, then customise using a visual interface. These plans will then be printable and editable at any time in the future.
In designing the interface, we will be especially interested in making the procedure straightforward for smaller supplies. Rather than starting from nothing, WINZ will create a basic plan semi-automatically, then local supplier knowledge can be used to add to or modify these to suit local conditions.
If you are about to create plans manually, we would be interested in working with you as we design the new modules.
Home | Water Supplies | NZ Processes | DWAP | Water Carriers | Laboratories | WINZ user | Data and Links | About WINZ | Contacts
ESR Water Group Web Solutions ©2008